Advisory groups give green light to city council on 7th Street: Remove parking for protected bicycle lane

College to Walnut Screen unimproved 7-Line aerial 10.33.35 PM
Segment of 7th Street between College Avenue and Walnut Street in downtown Bloomington.
College to Walnut Screen 7-Line aerial 10.33.35 PM
The images shows the segment of 7th Street between College Avenue and Walnut Street. The top image shows current parking and lane conditions. The lower image is a rendering of the 7-Line protected bicycle lane project. Both images link to an animated .gif of them alternating.

On Thursday, at its first regular meeting since the end of January, Bloomington’s parking commission reviewed the protected bicycle lane project that’s going to be built on 7th Street sometime in 2021.

It was in front of the commission because the 7-Line, to be built as a two-way bicycle path on the south side of the roadway, will require the removal of 113 on-street metered parking spaces. It’s the loss of parking spaces that has generated some concern among property owners along the corridor, among them the Monroe County government.

Parking commissioners gave a unanimous recommendation in support of the planning and transportation staff’s finding—that the three-quarter-mile bicycle lane from the B-Line Trail to the Indiana University campus at Woodlawn supports several goals of the city’s comprehensive plan and squares up with the city’s transportation plan.

As Beth Rosenbarger, Bloomington’s planning services manager, pointed out to parking commissioners, the city’s transportation plan calls for a protected bicycle lane along 7th Street. Continue reading “Advisory groups give green light to city council on 7th Street: Remove parking for protected bicycle lane”

7-Line protected bicycle lane: a bicentennial bond backgrounder

The 7-Line is a planned protected bicycle lane running east-west across downtown Bloomington towards the Indiana University campus.

It gets the numeric part of its name from 7th Street, where the 11-foot wide, two-way path will be constructed along the south side of the roadway, sometime in 2021. The non-numeric part of its name is patterned on the B-Line Trail, the north-south multi-use path along the former CSX railroad route that stretches 3.1 miles from Adams Street to Country Club Drive.

The 7-Line will connect to the B-Line just east of Madison Street.

The project has received increased exposure in the last week, as final design details are worked out.

Last Thursday (June 18), the project was introduced in more detail to the public. On Wednesday this week, the traffic commission was asked to weigh in on the changes to city code that are required for the removal of 113 metered parking spaces and the elimination of east-west stop signs at most of the cross streets.

This Thursday (June 25) the parking commission is getting its second look at the project, after discussing it at a work session earlier in the month.

The now-estimated $2 million construction cost will be paid for with parks bonds, which the city council and the board of park commissioners approved in late 2018, over a year and a half ago.

The three series of bonds, totaling $10.27 million were promoted by Bloomington mayor John Hamilton as “bicentennial bonds,” and pitched to the council as “a gift to the future, honoring Bloomington’s two hundred year anniversary.” Continue reading “7-Line protected bicycle lane: a bicentennial bond backgrounder”